PL / / DE / UA / FR
Request a quote

Condition Before Renovation

During inspection of a storage tank with external floating roof, serious damage to the sealing system was found. Identified problems included: cracks and deformations of the primary seal lip, corrosion of metal elements, loss of elasticity in sealing material, visible leaks and traces of product vapor emission.

Damage Documentation

  • Primary seal lip cracks along over 30% of the circumference
  • Corrosion of clamping plates resulting in loss of tightness
  • Deformation of secondary seal profile caused by long-term operation
  • Mechanical damage from previous service work

Renovation Work Performed

Techcom Serwis carried out comprehensive sealing system renovation:

  • Dismantling of damaged primary and secondary sealing system
  • Surface preparation - cleaning, corrosion removal, leveling
  • Installation of new Type F primary seal with clamping plates
  • Installation of new lip-type secondary seal
  • Adjustment and calibration of clamping system
  • Tightness tests and technical acceptance

Technical Parameters

  • Stored Product: Crude Oil
  • New Seal Type: Double Type F (primary) + lip type (secondary)
  • Seal Lip Material: Antistatic NBR

Achieved Results

  • Complete elimination of leaks and uncontrolled emissions
  • VOC emission reduction by over 98% confirmed by measurements
  • Restoration of full compliance with PN-EN 14015 standard
  • Extension of predicted system lifetime by minimum 15 years
  • Significant reduction in operational costs